Wasa Dredging | Hello world! https://wasadredging.fi Specialists in underwater blasting & dredging Thu, 30 Aug 2018 11:22:34 +0000 en-US hourly 1 https://wordpress.org/?v=6.4.3 Hello world! https://wasadredging.fi/2018/07/12/hello-world/ Thu, 12 Jul 2018 08:49:31 +0000 http://wasadredging.fi/?p=1 Welcome to WordPress. This is your first post. Edit or delete it, then start writing!

]]>
Hello world! https://wasadredging.fi/2018/05/23/hello-world-2/ Wed, 23 May 2018 11:47:48 +0000 http://bridge241.qodeinteractive.com/?p=1 Welcome to WordPress. This is your first post. Edit or delete it, then start writing!

]]>
September 2015 – Contract signed for Oslo Project https://wasadredging.fi/2015/09/30/september-2015-contract-signed-for-oslo-project/ Wed, 30 Sep 2015 11:22:02 +0000 http://wasadredging.fi/?p=804 Wasa Dredging have signed a contract for dredging and blasting of the Oslo Fairway.

“Innseiling Oslo” consists of 20+ areas of bedrock to dredge and is calculated to last for about half a year.

]]>
September 2015 – Start of Ålesund project https://wasadredging.fi/2015/09/30/september-2015-start-of-alesund-project/ Wed, 30 Sep 2015 11:21:33 +0000 http://wasadredging.fi/?p=802 Wasa Dredging started working in Ålesund, Norway. The project consists of blasting and dredging of four areas of bedrock.

]]>
September 2015 – Project in Pietarsaari Fairway complete https://wasadredging.fi/2015/09/30/september-2015-project-in-pietarsaari-fairway-complete/ Wed, 30 Sep 2015 11:21:05 +0000 http://wasadredging.fi/?p=800 Wasa Dredging has finished the project in Pietarsaari Fairway. WD removed about 970 000 m3 hard moraine, clay and sand.

WD also removed over 100 big stones and boulders during the project ranging from 5 m3 to 60 m3.

Equipment Used: Optimus, Hector, Boulder, Dana II & Miika II 940m3 barges, Laura & Jenna 700 m3 barges, Alex & Cellu 400 m3 barges.

]]>
December 2014 – Uusikaupunki project complete https://wasadredging.fi/2014/12/30/december-2014-uusikaupunki-project-complete/ Tue, 30 Dec 2014 11:20:32 +0000 http://wasadredging.fi/?p=798 Wasa Dredging has as of December 23rd completed the project in Uusikaupunki, Finland. The project included 98 000 m3 of rock blasting, 399 000 m3 of dredging of blasted rock aswell as 434 000 m3 dredged moraine. The project was completed according to schedule.

]]>
December 2014 – Contract signed for dredging of channel of Sommarøy, Norway https://wasadredging.fi/2014/12/30/december-2014-contract-signed-for-dredging-of-channel-of-sommaroy-norway/ Tue, 30 Dec 2014 11:19:57 +0000 http://wasadredging.fi/?p=796 The project consists of underwater blasting of 40 000 m3 rock, dredging of 90 000 m3 blasted rock and dredging of 180 000 m3 soil.
The contract also includes covering of polluted soil with clean soil, the building of a rock bank for storing of contaminated masses aswell as dredging of contanimated masses and relocation of these into a storage depo.
Client : Kystverket
]]>
Pietarsaari Harbour completed https://wasadredging.fi/2014/06/30/pietarsaari-harbour-completed/ Mon, 30 Jun 2014 11:19:20 +0000 http://wasadredging.fi/?p=793 The project in Pietarsaari Harbour is now completed as of fall 2014.

]]>
June 2014 – First job for backhoe dregder “Optimus” in Pietarsaari, Finland https://wasadredging.fi/2014/06/30/june-2014-first-job-for-backhoe-dregder-optimus-in-pietarsaari-finland/ Mon, 30 Jun 2014 11:18:40 +0000 http://wasadredging.fi/?p=791 Newly built backhoe dredger “Optimus” has started working in Pietarsaari Harbour.

]]>
February 2014 – Wasa Dredging on Facebook https://wasadredging.fi/2014/02/15/february-2014-wasa-dredging-on-facebook/ Sat, 15 Feb 2014 11:18:04 +0000 http://wasadredging.fi/?p=787 Wasa Dredging now have an official Facebook page. You can find the page by following the link:

www.facebook.com/wasadredging

]]>